THIS PAGE IS FOR RUNS BETWEEN EXISTING POSTS
                               
     
                   
                       
                         
                         
                         
                         
                         
                         
                         
                         
                         
                               
        Two examples of existing pillars or posts   When a run starts and finishes with an existing Post or Pillar, a SIDE FRAME is used, as shown. Please refer to instruction sheet in each box           
  Step 1.                          
                               
      SELECT COLOR  
                 
              PRODUCT CODE No, OF BOXES          
                       
                       
  Step 2.       Side Frames        
                         
      Select HEIGHT of Panel (Inches)  
             
                       
            2 Way Posts        
                       
                         
                         
              Slat Pack        
                         
                         
                             
  Step 3.   Enter in the below boxes, the LENGTH of each panel required